نموذج الاتصال

الاسم

بريد إلكتروني *

رسالة *

بحث هذه المدونة الإلكترونية

صورة

Over 42000 New Seats Installed At Jma Wireless Dome For Syracuse Footballs Home Opener

Thousands of new seats installed at JMA Wireless Dome before Syracuse's home opener

Over 42,000 new seats installed in $38 million renovation

Fans to experience a brand new game day experience inside the Dome

JMA Wireless Dome Syracuse

Just 10 days ahead of Syracuse's home football opener on Saturday, September 3, over 42,000 new seats have been installed at the JMA Wireless Dome.

The Carrier Dome is undergoing a $38 million renovation, which includes replacing the old, orange seats with new, wider, more comfortable seats.

The new seats are also made of a more durable material, which should last longer than the old seats.

Here are some of the details about the new JMA Wireless Dome seats:

  • The new seats are 19 inches wide, compared to 18 inches for the old seats.
  • The new seats have a higher backrest than the old seats.
  • The new seats are made of a durable plastic material.
  • The new seats are available in a variety of colors, including orange, blue, and white.

Fans should be aware that the new seating could impact their season ticket locations. Fans will be able to pick their new seat locations via an online portal this week.

The Dome renovation is expected to be completed by the end of the 2022 football season.


تعليقات